Friday, June 13, 2008

Reduced cost of odour control

Odor control costs reduced $1 million
Boca Raton News - FL, USA
A $2.8 million short-term odor control project with Florida Design, Inc. at the Southern Region Water Reclamation Facility and Water Treatment Plant No.3 ...